Before
Before the project was started.
Before p2
Before the slab was lifted and leveled.
Before p3
The outside patio before.
Before p4
The cracking slab before it was fixed.
After
After the cracks are lifted and filled.
Steps
The steps are leveled with the foam.
After p2
Full view of the finished patio.