Concrete Repair in Volga, IA
Challenge
The primary obstacle was ensuring the basement remained dry and structurally sound before any framing or drywall could be installed.
The Problem: Active settlement cracks were compromising the foundation.
The Risk: Refinishing a basement over untreated cracks can lead to mold growth, ruined drywall, and expensive repairs down the road.
The Client’s Goal: A permanent, non-invasive solution that wouldn't delay their remodeling timeline.
Solution
After a thorough inspection, our team determined that Polyurethane Crack Injection was the most effective method for this specific repair.
Unlike traditional epoxy, polyurethane remains flexible after it cures. This allows the seal to expand and contract with the natural movement of the Iowa soil, ensuring a long-lasting, watertight barrier.